SLIC European inspection and communication campaign
LIGHTEN THE LOAD

Select language: bg cz da de el  en  es et fi fr hu it lt lv nl pl pt ro sk sl sv

Campaign

Foundations

Information

Training

Inspections

Project assessment

Good practices

Construction

Trade

Risk Assessment

Level Concept

Level I

Level II

Level III

Methods and Tools

Check List

The KIM-Tool

The MAC-Tool

Control Tables

Check List

Risk Identification by using a standardised Check List


The Check list for risk identification consists of 19 questions to features of work load and conditions according to the Council directive, annex 1, which are answered by „yes“ or „no“.

In addition, the subjective work load felt by the workers and indicators for physical overload may be reported.

This Check list may be downloaded here:

 Check List for Risk Identification (file, 157 kB)

Quick links
Council Directive 90/269/EEC of 29 May 1990 on the minimum health and safety requirements for the manual handling of loads

European Agency for Safety and Health at Work

National Labour Inspectorates

Adobe Reader®

This website and all the publications it contains are supported by the European Community. The information contained on this website does however not necessarely reflect the position or opinion of the European Commission.

Ornak CMS